Industry Overview
Electrical tests for photovoltaic power stations are performed to verify the insulation performance, electrical parameters and operation reliability of PV equipment, ensure compliance with standards, and guarantee safe grid connection and stable, reliable operation.
| Test Objects (Tested Specimens) | Test Items | IEC Standards | ANSI/IEEE Standards |
| Photovoltaic (PV) Modules | Insulation Resistance Test, Ground Path Continuity Test, Leakage Current Measurement, Open-Circuit Voltage Test, Short-Circuit Current Test, Power Output Test, Temperature Coefficient Test, Thermal Cycle Test, Insulation Integrity Test | IEC 61215, IEC 61730, IEC 62108, IEC 61727 | IEEE Std 1513, IEEE Std 1262, ASTM E1462, UL 1703 |
| PV Inverters (PCS) | Input/Output Voltage & Current Test, Efficiency Test, Harmonic Distortion Test, Over/Under Voltage Protection Test, Under Voltage Ride-Through Test, EMC Test, Grid Connection Test, Isolation Test | IEC 61727, IEC 61800-1, IEC 62910, IEC 62920 | IEEE Std 1547, IEEE Std 519, UL 1741, IEEE Std 1262 |
| PV Combiner Boxes | Insulation Resistance Test, Conductor Continuity Test, Overcurrent Protection Test, Short-Circuit Test, Leakage Current Test, Voltage Drop Test, IP Protection Level Test | IEC 61439-1, IEC 61439-2, IEC 61727, IEC 62109 | IEEE Std 1547, IEEE Std 1262, UL 1741, ANSI C37.20.1 |
| PV Power Transformers | Winding Resistance Measurement, Voltage Ratio & Phase Displacement Test, Insulation Resistance Test, Dielectric Loss Test, No-Load Loss & Current Test, Load Loss Test, Short-Circuit Withstand Test | IEC 60076-1, IEC 60076-11, IEC 61439-1, IEC 62271-202 | IEEE Std C57.12.00, IEEE Std C57.12.90, IEEE Std 1547, IEEE Std C57.104 |
| PV Power Cables (DC/AC) | Conductor Resistance Measurement, Insulation Resistance Test, AC/DC Withstand Voltage Test, Partial Discharge Test, Thermal Aging Test, Flame Retardancy Test, UV Resistance Test | IEC 60502-1, IEC 60811, IEC 60228, IEC 61727 | IEEE Std 400, IEEE Std 48, IEEE Std 575, ASTM D877 |
| Surge Arresters (PV System) | Insulation Resistance Test, Leakage Current Measurement, Lightning Impulse Withstand Test, Operating Voltage Test, Thermal Stability Test, EMC Test | IEC 60099-4, IEC 60099-6, IEC 61727, IEC 61000-4 | IEEE Std C62.11, IEEE Std C62.22, IEEE Std 1547, IEEE Std 1262 |
| Protective Relays & PV Control Systems | Relay Function Test, Setting Value Calibration, Tripping Time Test, Interlocking Test, Communication Test with SCADA System, Grid Fault Ride-Through Test | IEC 61850, IEC 60255, IEC 61727, IEC 61508 | IEEE Std C37.2, IEEE Std C37.90, IEEE Std 1547, IEEE Std 61400-21 |
| PV Grid Connection Switchgear | Insulation Resistance Test, Dielectric Withstand Voltage Test, Contact Resistance Measurement, Mechanical Operation Test, Interlocking Test, Grid Connection Test, Short-Circuit Test | IEC 62271-100, IEC 62271-1, IEC 61439-1, IEC 61727 | IEEE Std C37.06, IEEE Std C37.20.1, IEEE Std 1547, IEEE Std C37.10 |
| PV Energy Storage Batteries | Capacity Test, Charge/Discharge Efficiency Test, Cycle Life Test, Overcharge/Overdischarge Protection Test, Internal Resistance Test, Insulation Resistance Test, Temperature Performance Test | IEC 62619, IEC 62133, IEC 61727, IEC 62933 | IEEE Std 1547.3, IEEE Std 1679.1, UL 9540, ANSI C12.20 |
Applicable scene
- Rooftop PV
- Ground-mounted PV Plant
- Agri-PV
- Floating PV