Technical Support

Do not do these ten things when installing the transformer

:2019-10-29 10:21:50:

Transformer is the heart of the power supply and distribution system, which transforms high-voltage power into low-voltage power for daily use. Transformer installation is also the most important part of the whole power installation project. To ensure the quality of transformer installation is very important for the stable operation of power supply and distribution system.
 
Do not do these ten things when installing the transformer
 
1. The transformer installation site should not be too far away. Try to avoid installing the transformer in the wilderness. If it is too far away, it will not only waste cables and wires, increase line loss, but also be inconvenient for management and maintenance.
 
2. Do not choose the capacity of transformer. It is necessary to select the transformer capacity reasonably. If the capacity is small, the overload operation of the transformer is easy to be damaged. If the capacity is over 30%, it can only operate for two hours at most. If the capacity is large, it will not only cause waste, but also increase the installation cost of transformer. Huaying power recommends you to find a professional power installation company for transformer installation.
 
3. Never ignore the transformer after installation and use. Many users think that the transformer can be used for more than ten or twenty years without any problems, so they put it out of management, and finally the transformer will be scrapped as early as possible. The daily monitoring of transformer shall be strengthened, and the three-phase imbalance phenomenon shall be adjusted in time to prevent the transformer from burning out.
 
4. Never install a metering box on the transformer. Sometimes, for the convenience of management, the metering box is directly installed in the transformer area. However, it is easy to damage the metering equipment and even the transformer when installing the metering box outdoors.
 
5. Do not mix high and low voltage fuses randomly. The high and low voltage fusible core on both sides of the transformer can play a good overload protection for the transformer. If the fusible core does not match the transformer, it is easy to burn the transformer, so it can not be randomly matched.
 
6. Never adjust the tap changer without permission. When the power load fluctuates greatly, if the tap changer is adjusted at will without relevant test, it is easy to cause the tap changer not in place, and then the distribution transformer will be burned.
 
7. The transformer must not be placed in the same space with high and low voltage equipment. In many cases, due to limited space or want to save cost, the transformer, high and low voltage switchgear are installed in the same distribution room without isolation. It is very dangerous to do so. Huaying power recommends that if you have to install it in the same distribution room, you can build a wall or install a transformer shell.
 
8. Do not forget to install lightning arrester at high and low voltage side of transformer. Transmission and distribution lines are easy to be damaged by lightning directly or indirectly, so it is necessary to install lightning arresters on both sides of high and low voltage to achieve the protection function.
 
9. Do not neglect the grounding system of transformer. Due to the long-term operation of the transformer, the grounding system may be rusted, broken, neutral point shifted, etc., especially the aluminum grounding wire, which should be checked regularly, and should not be ignored.
 
10. Do not despise the regular inspection of transformer. In many cases, the operation phase of the transformer is stable, but not ruled out, when the transformer fails. A large part of these faults are accumulated over time, such as whether the transformer oil is enough, whether the high and low voltage joints of the transformer are loose, whether there are foreign matters on the transformer, etc. Huaying power recommends that you make a scientific transformer management plan and resolutely implement it.

My Site © www.kvtester.com    Powered By Kvtester